3m site requirements

  • 3m chamber test requirements
    • Provide temporary power and lighting during construction.安装期间提供临时用电和照明。
    • Provide a parent room floor that is level to within l/8 in. per 10 ft.(non-cumulative).地面平整度满足3米范围内3毫米的高度误差,无累计误差。
    • Customer is responsible to have their building Engineer verify that theexisting concrete will support the Chamber. Chamber point loads see attached drawing.客户负责审核母体建筑承重能力,满足3米暗室要求。3米暗室承重请见图纸。
    • Provide clear access to project location for equipment and personnel anda clear work area during chamber installation.暗室安装期间,提供任何和材料/工具临时通道,以及干净的工作环境。
    • Operate the chamber in a temperature and humidity controlled environment,maintaining a temperature of 70° ±20° F and relative humidity of 50% ±20%.暗室操作环境温度控制在70° ±20°华氏度,相对湿度控制在50% ±20%
    • Compressed air 4.5-7.5Kg/cm2 for door and antenna mast.为气动门和天线塔提供4.5-7.5Kg/cm2的空气压力。
    • Isolation power transformer for power connect to power filter.暗室滤波器前端无漏电保护,或滤波器与配电箱之间安装有隔离变压器。
    • ETS-Lindgren’s project manager requires written customer approval of finalchamber drawings before beginning chamber fabrication.在暗室生产前,ETS-Lindgren的项目经理需要客户对暗室图纸的书面批准。
    • 用户提供一条独立的接地线,接地电阻小于1欧姆。


本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?立即注册

x
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

热门排行榜
  • 最新
  • 热门
摩尔集团仪器与系统集成事业部,是摩尔集团旗下事业部,为客户提供整体实验室建设方案:EMC实验室、OTA实验室、屏蔽房、射频实验室、蓝牙实验室、基带性能实验室、安规实验室、环境可靠性实验室、光学实验室、音频实验室等整体实验室及配套仪器仪表。
快速回复 返回顶部 返回列表